KY 8X (Dave Cowens Drive, Fairfield Avenue, Clay Street, Sixth Avenue) – 0.391 – 2.634 mile points – Two resurfacing projects are scheduled to begin Sunday, Sept. 17. Crews will be working on KY 8X from Park Avenue to KY 6335. The contractor plans to do most of the resurfacing work Monday through Friday between the evening/overnight hours of 8 p.m. and 7 a.m. Some minor operations requiring a single lane closure may be necessary on weekdays between 9 a.m. and 3 p.m. One lane of traffic will be maintained in each direction at all times during construction. Lane closures will only be required during working hours. Crews will begin by addressing base failures on KY 8X in Bellevue and Newport, and then will work east on KY 8X through Dayton. Signage will be posted on KY 8X warning motorists in advance of no street parking while the project is ongoing. Motorists are encouraged to find alternate parking on side streets in accordance to city parking regulations. Flaggers will be in place to guide traffic safely through the work zone. Motorists should drive slowly through the project area, and watch for trucks entering/leaving the work zone during working hours. These resurfacing projects are expected to be completed by Wednesday, Nov. 15.
Recent Comments